“This untimed practice quiz simulates the ICC exam format, giving you full exposure to real-style questions while allowing unlimited time to navigate, learn, and build confidence without time pressure.”

2024 Residential Energy Inspector/Plans Examiner (79) (Untimed)

60 Questions

2 Hours

1 / 60

1. Freeze protection systems must include automatic controls configured to shut off the systems when outdoor air temperatures are above 40°F (4.4°C) or when what other condition is met?

2 / 60

2. For a dwelling unit with more than 5,000 square feet of living space located above grade plane, what is the amount of additional credits required?

3 / 60

3. Air leakage testing must be reported at a pressure differential of 0.2 inch water gauge, which is equivalent to what pressure in Pascals (Pa)?

4 / 60

4. What is the maximum emittance surface value required for a material to be defined as a radiant barrier?

5 / 60

5. A third-party test of a mechanical ventilation system is not required if the system has an integrated diagnostic tool used for airflow measurement and communicates the installed airflow rate via which component?

6 / 60

6. Any space that is converted to a dwelling unit or portion thereof from another use or occupancy shall comply with which section?

7 / 60

7. Products lacking a labeled U-factor shall be assigned a default U-factor from Table R303.1.3(1) or which other table?

8 / 60

8. What is the climate zone designation for Anchorage, Alaska?

9 / 60

9. Where an alternative is not approved, how shall the code official respond to the applicant?

10 / 60

10. New HVAC ductwork installed as part of an addition shall comply with which section?

11 / 60

11. Which component is explicitly listed as space conditioning equipment?

12 / 60

12. Any unconditioned or low-energy space altered to become conditioned space must be brought into full compliance with which section?

13 / 60

13. The U-factors of fenestration products (windows, doors, skylights) shall be determined in accordance with which standard?

14 / 60

14. To whom shall an approved third-party inspection agency submit reports of delegated inspections and tests?

15 / 60

15. How many credits are earned in Climate Zone 7 for installing a Gas-fired instantaneous water heater (Option 1) (R408.2.3(2)(a))?

16 / 60

16. When shall the applicant for a permit provide an estimated value of the work?

17 / 60

17. Heating and cooling equipment must be sized in accordance with ACCA Manual S based on building loads calculated using which standard?

18 / 60

18. What are the insulation requirements for an unheated slab in Climate Zone 4 (except Marine)?

19 / 60

19. What is the default Solar Heat Gain Coefficient (SHGC) for single glazed, tinted fenestration?

20 / 60

20. For roof insulation installed above the deck, where shall the required R-value labeling be specified?

21 / 60

21. Which alternative standard, besides NFRC 100, can be used to determine the U-factor of a garage door?

22 / 60

22. For the R-value of an enclosed airspace to be used for compliance, how must the airspace be bounded?

23 / 60

23. If a dwelling unit complying with R405 Simulated Building Performance has 6,000 square feet of living space located above grade plane, the annual energy cost must be reduced by an additional what percentage of the SRD annual energy cost?

24 / 60

24. Alterations shall be such that the existing building or structure is not less conforming to the provisions of this code than it was prior to the alteration, and shall not create which conditions?

25 / 60

25. For vertical fenestration installed in Climate Zone 6 above 4,000 feet in elevation, what is the maximum permissible U-factor?

26 / 60

26. Roof and gutter deicing systems must include automatic controls configured to shut off the system when the outdoor temperature is above what value?

27 / 60

27. What is the air sealing requirement for floor framing members that are part of the building thermal envelope?

28 / 60

28. Which item is specifically verified during the Mechanical Rough-in Inspection (R107.2.4)?

29 / 60

29. For a building with 10 dwelling units, how many units must be tested for air leakage according to the unit sampling procedure?

30 / 60

30. For a duct system serving 800 ft² of conditioned floor area where the space conditioning equipment is not installed, what is the maximum total duct system leakage permitted?

31 / 60

31. Demand recirculation water systems must shut off the pump if the temperature sensor detects an increase in water temperature of not more than what value above the initial temperature of the water in the pipe?

32 / 60

32. To qualify for the Compact Hot Water Distribution System Option credit (R408.2.3.1), the pipe must store not more than what maximum volume of water between the nearest source of heated water and the termination of the fixture supply pipe?

33 / 60

33. What is the minimum efficacy (CFM/WATT) required for an HRV or ERV system?

34 / 60

34. Snow- and ice-melting systems must include an automatic control capable of shutting off the system when the pavement temperature is greater than 50°F (10°C) and which meteorological condition is not occurring?

35 / 60

35. When is the code official authorized to accept reports of third-party inspection agencies?

36 / 60

36. For basement walls associated with unconditioned basements to be exempt from insulation requirements, which separation element must be insulated in accordance with R402.1.3?

37 / 60

37. Which substance is included in the definition of fuel gas?

38 / 60

38. For calculating the Standard Reference Design (SRD) specifications, if the proposed design wall is not a mass wall, the SRD wall type shall be modeled as what?

39 / 60

39. The duct system leakage testing required by R503.1.2.3 is exempted if the duct system is located entirely where?

40 / 60

40. Which compliance path, if utilized by the addition alone or the existing building and addition together, exempts the project from the Additional Energy Efficiency Credit Requirements (R502.2.5)?

41 / 60

41. When an emergency exists, what requirement for a stop work order is the code official not required to follow?

42 / 60

42. If new interior finishes or exterior wall coverings are applied to the full extent of any exterior wall assembly of mass construction, which requirement must the insulation comply with?

43 / 60

43. Which section governs the prescriptive compliance requirements for additions?

44 / 60

44. How is the additional exterior lighting power allowance for building facades calculated?

45 / 60

45. Regarding its financial structure, what is required of an approved third-party inspection agency?

46 / 60

46. For steel-frame walls that contain no cavity insulation but use continuous insulation to satisfy the U-factor maximum, what constraint is placed on the steel-framed wall member spacing?

47 / 60

47. What characteristic defines a building site?

48 / 60

48. Which document detail, if applicable, is required to be included on the construction documents?

49 / 60

49. If a dwelling unit complies with the Whole-Home Lighting Control credit (R408.2.10), what is the maximum percentage of the total lighting power that may remain uncontrolled?

50 / 60

50. What length of time must a construction project, which had a lawful permit issued before the code’s effective date, have been pursued in good faith to avoid being subjected to changes required by the new code?

51 / 60

51. What minimum R-value of continuous insulation (ci) is required entirely above the roof deck in Climate Zone 7?

52 / 60

52. What is the maximum U-factor permitted for a skylight in Climate Zone 6?

53 / 60

53. If a project in Climate Zone 5 uses an Above Code Program and the $TC_{Prescriptive reference design}$ is calculated to be 50 BTU/h/ft², what is the maximum $TC_{Proposed design}$ allowed for compliance?

54 / 60

54. In Climate Zone 0, to earn credit for Roof Solar Reflectance Index (R408.2.1.3), the 3-year-aged SRI must be greater than or equal to what value?

55 / 60

55. When calculating the effect of ventilation in exterior wall cavities using the exception to R303.1.6, the minimum air movement rate entering the bottom and exiting the top of the airspace shall be not less than what rate?

56 / 60

56. For the Standard Reference Design (SRD) calculation, what is the assumed duct location (supply and return) for a two-story building with a slab on grade foundation?

57 / 60

57. Which standard is used to determine the Solar Heat Gain Coefficient (SHGC) and Visible Transmittance (VT) of glazed fenestration products?

58 / 60

58. For the Standard Reference Design (SRD) calculation, the total area of vertical fenestration shall be limited to what percentage of the conditioned floor area if the proposed design glazing area is 15 percent or more of the conditioned floor area?

59 / 60

59. When performing a repair, which materials are permitted to be used if hazards to life, health, or property are not created?

60 / 60

60. Which product listed in Table R303.1.3(1) has the lowest default U-factor?

Your score is