You will have 2 hours to complete your exam.

GOOD LUCK


Residential Building Inspector (B1)

60 Questions

2 Hours

1 / 60

1. What is the required extent of the ice barrier for BIPV roof panels in areas with historical ice damming?

2 / 60

2. Which of the following is NOT a permitted material for waterproofing foundation walls in areas with a high water table or severe soil-water conditions?

3 / 60

3. What is the maximum allowable span for a 2-2×4 header supporting a roof and ceiling in a 12-foot-wide building with a 30 psf ground snow load?

4 / 60

4. How long does a permit remain valid if work does not commence?

5 / 60

5. What is the minimum time that each coat of cement plaster must be kept moist before applying the next coat?

6 / 60

6. What is the minimum required width for a shower stall?

7 / 60

7. What is the minimum required bearing length for joists in masonry construction, except as otherwise specified?

8 / 60

8. What is the maximum stud spacing allowed for Structural Fiberboard Sheathing (SFB) bracing?

9 / 60

9. When are cuts, notches, or holes allowed in engineered wood products such as trusses, glue-laminated members, or I-joists?

10 / 60

10. What is the minimum required net area of ventilation opening for a crawl space?

11 / 60

11. When must truss design drawings be approved by the building official?

12 / 60

12. Which ASTM standard applies to EPDM (Ethylene Propylene Diene Monomer) single-ply roofing?

13 / 60

13. What is the minimum required penetration of screws into wood when attaching gypsum board to wood framing?

14 / 60

14. In cold-formed steel framing, under what condition is the required number of screws for header-to-king stud connections permitted to be reduced by half?

15 / 60

15. What standard can be used as an alternative for designing and constructing concrete slab-on-ground floors?

16 / 60

16. What is the minimum allowable stud thickness for exterior and interior load-bearing cold-formed steel walls when reduced to the next thinner size?

17 / 60

17. What is the minimum grade requirement for blocking and subflooring materials?

18 / 60

18. How must deck beams be connected to supporting members to prevent lateral displacement?

19 / 60

19. What is the maximum allowable height difference between the threshold of an egress door and the landing outside?

20 / 60

20. For a 8-inch waffle-grid basement wall with 9 feet of unsupported wall height, 6 feet of unbalanced backfill, and GM soil, what is the minimum required vertical reinforcement?

21 / 60

21. In windborne debris regions, what test standards must impact protective systems comply with for impact resistance?

22 / 60

22. How must roof rafters be connected to a ridge member?

23 / 60

23. What is required between exterior masonry veneer supported by wood and veneer supported by the foundation?

24 / 60

24. What happens if a permit was issued in error?

25 / 60

25. Which of the following bracing methods do NOT require interior finish material opposite the braced wall panel?

26 / 60

26. According to the IRC, how must deck posts be restrained laterally when bearing on concrete footings?

27 / 60

27. How must precast concrete foundation wall panels be identified?

28 / 60

28. How does the horizontal reinforcement requirement change for concrete basement walls greater than 8 feet in height?

29 / 60

29. What is the minimum required bearing for a joist on masonry or concrete?

30 / 60

30. What is the minimum required clearance between unlisted combustion air ducts and combustibles within 5 feet of the outlet?

31 / 60

31. What is the maximum allowable design live load for sleeping areas and attics with fixed stairway access?

32 / 60

32. What is the minimum footing size (width × thickness in inches) required for a 3-story with basement, light-frame with brick veneer slab-on-grade structure with a 20 psf roof live load and 1,500 psf soil bearing capacity?

33 / 60

33. What is the required nail spacing when installing 1/2-inch gypsum board to ceiling framing spaced 16 inches on center, applied parallel to framing, without adhesive?

34 / 60

34. What is the maximum allowable span for a 2×10, SS grade Spruce-pine-fir rafter spaced 16 inches apart, with a dead load of 20 psf, ceiling not attached, and a roof live load of 30 psf?

35 / 60

35. When using anchor bolts in concrete, what is the minimum required embedment depth?

36 / 60

36. According to the IRC, no more than what fraction of the required braced wall panel length can be located to one side of a braced wall line?

37 / 60

37. What is the maximum allowable variation from the specified location of vertical reinforcement in basement walls?

38 / 60

38. What reference should be used to determine the maximum allowable spans for wood structural panel roof sheathing?

39 / 60

39. What is the minimum ceiling height required for habitable rooms?

40 / 60

40. What is the maximum thickness of cement plaster allowed on monolithic concrete ceilings?

41 / 60

41. What is the minimum lap required for fiber-cement lap siding?

42 / 60

42. What is the maximum allowable slump for concrete placed in removable forms?

43 / 60

43. What is the minimum footing size (width × thickness in inches) required for a 3-story light-frame with brick veneer crawl space structure with a 50 psf roof live load and 1,500 psf soil bearing capacity?

44 / 60

44. What is the maximum spacing for anchor bolts securing a sill plate to a foundation wall?

45 / 60

45. What does ‘Construction Documents’ refer to in the 2024 IRC?

46 / 60

46. What is the maximum allowable span for a 2×10, #1 grade Hem-fir rafter spaced 16 inches apart, with a dead load of 20 psf, ceiling not attached, and a roof live load of 70 psf?

47 / 60

47. For a 2-2×10 header supporting a roof, ceiling, and one clear-span floor in a 36-foot-wide building with a 30 psf snow load, what is the maximum allowable span?

48 / 60

48. What is the maximum allowable building length perpendicular to the joist or truss span for exterior and interior load-bearing cold-formed steel wall framing?

49 / 60

49. What is the maximum height of the bottom of the clear opening above the floor for an emergency escape opening?

50 / 60

50. Can local, state, or federal laws override the provisions of the IRC?

51 / 60

51. What is the maximum allowable slope for a ramp not serving an egress door?

52 / 60

52. What is the purpose of lateral restraint at the ends of joists?

53 / 60

53. According to cold-formed steel framing requirements, what is the minimum percentage of the braced wall line length that must consist of full-height sheathing?

54 / 60

54. What must be included in precast concrete foundation wall design drawings submitted for approval?

55 / 60

55. Cold-formed steel roof framing is limited to what maximum ultimate design wind speed under the standard applicability limits?

56 / 60

56. What is required for sawn lumber to be used for load-supporting purposes?

57 / 60

57. What is the maximum allowable joist spacing for ¾-inch sanded plywood combination subfloor underlayment?

58 / 60

58. What is required when attaching a frost-protected shallow foundation to an unheated slab-on-ground structure?

59 / 60

59. What is the minimum required thickness of a granular base placed over compacted earth in a pressure preservative-treated wood floor system?

60 / 60

60. What is the presumptive load bearing capacity of Sand?

Your score is